Skip to main content
Covered Bridge to Pleasant Hill Dam Trail route map
Difficulty: ModerateLoop

Covered Bridge to Pleasant Hill Dam Trail

Perrysville, Ohio

2.3 mi

Distance

512 ft

Elev. Gain

53m

Est. Time

Loop

Route Type

Moderate

Difficulty

About This Trail

Covered Bridge to Pleasant Hill Dam Trail is a loop trail in Mohican State Park, managed by the Ohio Department of Natural Resources, Division of Parks and Watercraft, in Ashland County, Ohio. It is 2.3 miles long and gains 512 feet. The nearest town is Perrysville, Ohio, about 3 miles away in a straight line.

From the trail data on this page. For conditions and closures, see official sources.

Trail Conditions

Trail Conditions

Unknown

We have no current condition data for this trail. Check with the operator before you go, and submit a report below if you've been recently.

No recent condition reports. Be the first to share what you see on the trail.

Elevation Profile

Min:303 ft
Max:367 ft
Gain:156 ft
Loss:156 ft
Elevation profileA line rising and falling between 303 ft and 367 ft across 2.3 mi along the route, drawn from start to end.303 ft324 ft346 ft367 ft0.0 mi0.6 mi1.2 mi1.7 mi2.3 mi

Elevation at the labelled points along this route
PointDistance from startElevation
Start0.0 mi304 ft
High point1.0 mi367 ft
End2.3 mi304 ft

Trail Details

Route Type
Loop

Official sources & verification

Managed by Ohio Department of Natural Resources, Division of Parks and Watercraft

Verify before you go

Source of truth

Where it is

Nearest town:
Perrysville, OH · about 3 mi away
County:
Ashland County, OH
Jurisdiction:
Mohican State Park · Ohio Department of Natural Resources, Division of Parks and Watercraft

Nearest town and county from U.S. Census Bureau place records and county boundaries.

Verify by phone or mail

We display cached information from agency feeds. Hours, fees, permits, closures, fire restrictions, and conditions change without notice. Outdoors is not the permitting authority. Confirm current conditions for this trail using the links above before you go — you are responsible for compliance. Last verified by us: May 23, 2026. Our copy is more than a month old — please reconfirm with the agency before relying on it.Spot an error in our data?

Reviews

No reviews yet

Be the first to share your experience and help others plan their visit.

Legacy import — verify before navigating

Path geometry came from our pre-launch legacy database. Routes have not yet been re-verified against the operator and may differ from the actual trail.

Spot an error in our data on Covered Bridge to Pleasant Hill Dam Trail?