Skip to main content

Status unknown — verify before visiting

We don't have current condition data for this trail. Check with the land manager before you go.

B-Line Trail
EasyOut and Back

B-Line Trail

Bloomington, Indiana

6.2 mi

Distance

262 ft

Elev. Gain

2h 9m

Est. Time

Out & Back

Route Type

Easy

Difficulty

About This Trail

Imported description
A trail in Bloomington, Indiana. The rail trail will continue to the southern part of Country Club Drive. The information is at www.bloomington.in.gov.

From Wikipedia

The B-Line Trail is a multi-use trail in Bloomington, Indiana, connecting the city's downtown to outlying neighborhoods. Multiple plazas are located along the trail, as well as numerous works of public art, such as murals and sculptures. The trail's route includes Switchyard Park, a linear park constructed on the site of the former McDoel Switchyard. The trail connects with the Bloomington Rail Trail at Country Club Drive, which in turn connects to the Clear Creek Trail.

Source: Wikipedia — text licensed CC BY-SA 4.0. Verify trail conditions and seasonal closures with the managing agency before you go.

Trail Conditions

Trail Conditions

Unknown

We have no current condition data for this trail. Check with the operator before you go, and submit a report below if you've been recently.

No recent condition reports. Be the first to share what you see on the trail.

Elevation Profile

Min:213 ft
Max:263 ft
80 ft
80 ft
213 ft230 ft246 ft263 ft0.0 mi1.6 mi3.1 mi4.7 mi6.2 mi

Trail Details

Route Type
Out & Back
Surface
Dirt

Official sources & verification

We don't have curated agency sources for this trail in our cache yet. Outdoors is not the permitting authority — confirm conditions, permits, and access with the managing agency before you go. If you know who manages this trail, please tell us.

Reviews

No reviews yet

Be the first to share your experience and help others plan their visit.

Legacy import — verify before navigating

Path geometry came from our pre-launch legacy database. Routes have not yet been re-verified against the operator and may differ from the actual trail.

Spot an error in our data on B-Line Trail?