Skip to main content

Status unknown — verify before visiting

We don't have current condition data for this trail. Check with the land manager before you go.

Virginia Central Railway (Fredericksburg)
ModerateOut and Back

Virginia Central Railway (Fredericksburg)

Fredericksburg, Virginia

6.4 mi

Distance

525 ft

Elev. Gain

2h 15m

Est. Time

Out & Back

Route Type

Moderate

Difficulty

About This Trail

Imported description
The train station is right in the center of the city. There is parking on the corner of Essex and Cobblestone Circle. The path is easy for everyone to navigate. You cross both Routes with traffic control. It enters a wooded area with three bridge crossing just after entering the city on Route 3. The restroom are available at the 1.5 mile mark. There are two choices when you're near the end of the trail. One takes you up to a neighborhood that is already well-equipped, while the other takes you to a less improved area.

Trail Conditions

Trail Conditions

Unknown

We have no current condition data for this trail. Check with the operator before you go, and submit a report below if you've been recently.

No recent condition reports. Be the first to share what you see on the trail.

Elevation Profile

Min:9 ft
Max:68 ft
160 ft
160 ft
9 ft29 ft48 ft68 ft0.0 mi1.6 mi3.2 mi4.8 mi6.4 mi

Trail Details

Route Type
Out & Back
Surface
Dirt

Official sources & verification

We don't have curated agency sources for this trail in our cache yet. Outdoors is not the permitting authority — confirm conditions, permits, and access with the managing agency before you go. If you know who manages this trail, please tell us.

Reviews

No reviews yet

Be the first to share your experience and help others plan their visit.

Legacy import — verify before navigating

Path geometry came from our pre-launch legacy database. Routes have not yet been re-verified against the operator and may differ from the actual trail.

Spot an error in our data on Virginia Central Railway (Fredericksburg)?