Skip to main content
Rogue River Natural Bridge route map
Difficulty: EasyOut and Back

Rogue River Natural Bridge

Prospect, Oregon

1.6 mi

Distance

151 ft

Elev. Gain

37m

Est. Time

Out & Back

Route Type

Easy

Difficulty

About This Trail

Rogue River Natural Bridge is an out-and-back trail in Rogue River National Forest, managed by the United States Forest Service, in Jackson County, Oregon. It is 1.6 miles long and gains 151 feet. The nearest town is Prospect, Oregon, about 8 miles away in a straight line.

From the trail data on this page. For conditions and closures, see official sources.

Trail Conditions

Trail Conditions

Unknown

We have no current condition data for this trail. Check with the operator before you go, and submit a report below if you've been recently.

No recent condition reports. Be the first to share what you see on the trail.

Elevation Profile

Min:982 ft
Max:1,051 ft
Gain:141 ft
Loss:141 ft
Elevation profileA line rising and falling between 982 ft and 1,051 ft across 1.6 mi along the route, drawn from start to end.982 ft1,005 ft1,028 ft1,051 ft0.0 mi0.4 mi0.8 mi1.2 mi1.6 mi

Elevation at the labelled points along this route
PointDistance from startElevation
Start0.0 mi994 ft
High point0.8 mi1,051 ft
End1.6 mi994 ft

Trail Details

Route Type
Out & Back

Official sources & verification

Managed by United States Forest Service

Verify before you go

Managing agency

Where it is

Nearest town:
Prospect, OR · about 8 mi away
County:
Jackson County, OR
Jurisdiction:
Rogue River National Forest · United States Forest Service

Nearest town and county from U.S. Census Bureau place records and county boundaries.

We display cached information from agency feeds. Hours, fees, permits, closures, fire restrictions, and conditions change without notice. Outdoors is not the permitting authority. Confirm current conditions for this trail using the links above before you go — you are responsible for compliance. Last verified by us: May 23, 2026. Our copy is more than a month old — please reconfirm with the agency before relying on it.Spot an error in our data?

Reviews

No reviews yet

Be the first to share your experience and help others plan their visit.

Legacy import — verify before navigating

Path geometry came from our pre-launch legacy database. Routes have not yet been re-verified against the operator and may differ from the actual trail.

Spot an error in our data on Rogue River Natural Bridge?